Do not drag or drag the geomembrane during transportation to avoid sharp objects.
1. It should extend from the bottom to the high position, not too tight, and should leave a margin of 1.50% for local sinking and stretching. Considering the actual situation of this project, the slope adopts the laying order from top to bottom;
2. The longitudinal joints of the adjacent two should not be on a horizontal line, and should be staggered by more than 1m from each other;
3. The longitudinal joint should be more than 1.50m away from the foot of the dam and the foot of the bend, and should be set on the plane;
4. First slope and then bottom of the field;
5. When laying the slope, the direction of the film should be basically parallel to the maximum slope line.